<img src="https://www.acuteimaginative.com/803888.png" style="display:none;">
Skip to content

Altecnic - Clear, Defined Pedestrian Walkways

Altecnic’s new warehouse needed safe, clear pedestrian routes. We delivered a complete solution with polymer barriers, gates, and floor markings to keep people and vehicles apart.
IMG-20250123-WA0000
Who are Altecnic?
 
 

Altecnic are the UK’s leading supplier of high-quality heating and plumbing components. Their products are used nationwide by engineers, specifiers and contractors, and they are known for their commitment to technical excellence and safety standards across their facilities.

altecnic's Challenges
 
 

After moving into their new warehouse, Altecnic wanted to ensure the site was safe and efficient from day one. Their priority was to separate pedestrian walkways from forklift traffic and clearly define safe routes.

There were two challenges to overcome:

- Floor surface water in certain areas created slip risks and made line marking more difficult.


- Concrete conditions weren’t ideal for barrier installation, making it harder to secure the system without causing damage.


Altecnic needed a partner who could handle both line marking and barriers, and deliver a complete solution despite the site limitations.

Pedestrian Segregation Barrier in UK factory
Barrier Installation at Altecnic
Polymer Barrier Install
MPM Plastic Barrier
Safe Pedestrian Walkways
Mighty Line Durable Tape Walkway
Defined Charging Walkway - Barrier and Tape
Floor Marking Tape
Safety Barrier Pedestrian Routes
Pedestrian Gate System - Polymer Barriers
Safe Walkway Gate in UK Factory

The Solution:

Clarity Safety designed and delivered a complete pedestrian safety system tailored to Altecnic’s site.

We supplied and installed:

  • Pedestrian polymer barriers to create clear segregation from forklift routes

  • Low-level barriers for additional protection in high-traffic areas

  • Gates for controlled access points

  • Floor stickers and floor tape to mark and reinforce walkways throughout the facility

This combined solution gave Altecnic a safer, more organised site layout, reducing the chance of collisions and improving confidence for both staff and visitors.

Succeed with Clarity
1-Mar-11-2024-12-06-40-3471-PM
0 +
Employees Protected from Incidents
2-Mar-11-2024-12-06-40-3496-PM
£ 0 M
Real Estate Assets Protected
3-Mar-11-2024-12-06-40-3572-PM
0 +
Satisfied Sectors
4-Mar-11-2024-12-06-40-3302-PM
0
Hours saved per project
DW

Choose Clarity for your workplace needs

Get in touch and speak with a visual management specialist to answer any questions you may have on our products, or business.

 

Speak to Damian today
01482 296451

Want to decrease your maintenance cost by implementing barriers like these?

Other Case Studies
1-Mar-13-2024-09-58-55-6967-AM

  Network Rail

 

2-Mar-13-2024-09-58-55-6970-AM

  BLE Lighting

 

3-Mar-13-2024-09-58-55-7350-AM

  E+R Group